PhaseRaiser®

The patented PhaseRaiser® system is the most innovative and economical way to increase conductor clearance on energized lines. A qualified line crew of 5 can raise an average of 3-5 structures per day without taking the line out of service, saving significant amounts of money versus structure changeouts. H-frame structures can be raised an additional 5, 10, 15 or 20 feet for about one-third the cost of a changeout. Since 1997, more than 12,000 energized structures have been safely raised using the PhaseRaiser® system. A specialized equipment trailer is required and can be purchased or rented from LWS.

Engineered wood, as a structural material, has the least "cradle to grave" impact on the environment when compared to concrete & steel.

Source: APA Engineered Wood Association

LWS has earned the reputation of providing the most positive, engaged customer experience in the industry. Our team strives to meet and exceed this expectation on every project, big or small.

Seth Gutz

President, LWS

Having introduced E-LAM® poles back in 1992, our engineering expertise and experience is unmatched in the electric utility industry. 

Brian Hitz, P.E.

Vice President, Engineering, LWS